8 September, 2023
Jornada divulgativa celebrada en el Museo de Castejón, Navarra, sobre el meandro de El Señorío

The conference on the adaptation of the meander of El Señorío (Castejón) attracts a large number of riverside visitors

Stakeholders were able to learn in detail about the planned intervention to reduce the risk of flooding, future environmental restoration and participatory actions.
7 September, 2023
La Costa Rica Aragonesa.  Laura Barrau

See the winning image of the II Edition of the Ebro Resilience Photo Contest

In addition to the winning photograph, five runner-up prizes were awarded to the photographs with the highest number of votes. The Ebro Resilience Strategy once again invited its community to participate in the 2nd Edition of the Ebro Resilience Photo […]
28 August, 2023
Aguilar Meander

Public information on Phase 1 of the improvement of flood resilience in the Osera-Fuentes de Ebro section (Zaragoza).

This phase consists of the morphological adaptation of the Ebro in Zone 2 of the LIFE Ebro Resilience P1 Project.
10 August, 2023

LIFE team holds a meeting with mayors of the area on the El Señorío meander (Navarra)

In addition to this meeting with the representatives of the city councils, a public information day has been organized for the first week of September, which will include a visit to the intervention area.
26 July, 2023

Ebro Resilience environmental actions: permeabilization of the Pina Dam, Ebro River (Zaragoza).

In addition to reducing the risk of flooding in the middle stretch of the Ebro, the Strategy aims to improve the ecological status of the intervention sections, such as this intervention, which will maintain the use of the infrastructure by improving the longitudinal continuity of the river.
19 July, 2023

Processes of participation in river restoration in the Ebro basin: Noguera de Tor case (Lleida).

The main ingredients of the actions of the LIFE Ebro Resilience P1 Project, participation in the whole process of defining solutions to reduce the risk of flooding and the combination of actions after a detailed study of alternatives, are applied in interventions outside the Resilience territory, in actions of the National Strategy for River Restoration in other parts of the Ebro basin.
17 July, 2023

Phase 1 of the environmental restoration of the Ebro river in “El Ortigoso”, Milagro (Navarra) is completed.

The works have had a budget of 1,432,467 € and 6.4 hectares of river space have been recovered with plantations of native riverside species, reaching 12,000 specimens.
12 July, 2023
Portada de la guía de adaptación de explotaciones ganaderas

Navarra Government announces subsidies for adaptation to flood risk in the Ebro Basin

The Government of Navarra, within the framework of the Recovery, Transformation and Resilience Plan (PRTR), has called for grants for actions to adapt to the risk of flooding of buildings, equipment and facilities or existing farms in the Ebro Basin.
23 June, 2023

LIFE Ebro Resilience P1: the Ebro basin, intervention model in RestauraRíos

The actions planned for the river and the proposals for participation and capacity building have passed through the plenary and parallel sessions of the IV Iberian Congress on River Restoration, the most important event on river restoration in Spain and Portugal.
English