3 February, 2025

Nature makes its way: meander of La Roza, Alfaro, one year later

The new video of the LIFE Ebro Resilience P1 Project shows the space recovered for the river, analyzes with the technicians of the CHE and the Government of La Rioja the interventions carried out and shows the effect of these actions during the last floods.
23 January, 2025

Tools for the adaptation of the riparian population: tips for self-protection against floods

Responding to the request of the people participating in the different groups of the LIFE Ebro Resilience P1 Project, we compiled information from different official sources of civil protection in order to face the flood phenomenon.
28 November, 2024

The second phase of the adaptation of the irrigation infrastructure in Fuentes de Ebro (Zaragoza) begins.

The work on the new underground pipeline, far from the bed of the Huerta del Ebro Irrigation Community (Zaragoza), is focused on the last kilometer of the infrastructure and is being carried out on dates that do not interfere with the irrigation campaign.
16 October, 2024

Navarre farmers and municipal representatives learn about Ebro Resilience experiences in Aragon

In October, the Government of Navarra, through GAN-NIK and together with the CHE, organized two conferences to inform municipal representatives and farmers of the region about the Ebro Resilience interventions in Aragón to adapt agricultural areas to floods and to assess the value of reproducing them.
15 October, 2024

Ebro Resilience environmental actions: a fish pass in El Bocal (Navarre)

In addition to reducing the risk of flooding in the middle stretch of the Ebro, the Strategy aims to improve its ecological state and this action seeks to improve the longitudinal continuity of the river, allowing fish to pass through the two existing dams at El Bocal.