15 April, 2024

Informative sessions of the Government of Navarre on subsidies for adaptation to flood risks

On April 30 and May 2 and 3, the Directorate General for the Environment of Navarra will resolve doubts about the two calls for subsidies addressed to local entities for actions for protection and adaptation to flood risk, both with NextGeneration funds and one of them focused on the municipalities within the scope of the Ebro Resilience Strategy.
12 April, 2024
Foto de grupo con bandera LIFE visita Organismos de cuenca de toda España al meandro de La Roza, Alfaro.

LIFE Ebro Resilience P1: hosts basin organizations from all over Spain to discuss adaptation and public participation

Up to 40 technical colleagues from state and regional river basin organizations have learned first-hand about the Project's ongoing actions and its pioneering proposal for social participation, during the conferences held on April 10 and 11.
22 March, 2024
Estrategia Ebro Resilience y Proyecto LIFE Ebro Resilience P1

Ebro Resilience Strategy and LIFE Ebro Resilience Project P1

Coordination and participation as a tool to achieve a more flood-resilient middle Ebro, improving the ecological status and local biodiversity. In the framework of World Water Day, which is celebrated every March 22nd, the Strategy Ebro Strategy Resilience Strategy Strategy […]
21 March, 2024
Vista del meandro y del cauce de alivio de La Roza, Alfaro, La Rioja

The relief channel in the meander of La Roza: a riparian corridor with more continuity and diversity for habitats.

The restoration of vegetation that is being carried out with vegetation typical of the Ebro riverbank in this channel, created during the morphological adaptation, gives us the excuse to talk about this type of intervention.
13 March, 2024
Meandro de la roza con máximos caudales registrados en el episodio de crecidas (unos 2.000 m3/s) en el tramo medio.

Ebro Resilience Interventions: a review in images of the last flooding of the river

The last week of February has seen a flood of flows in the middle stretch of the Ebro due to the rains recorded in the Ebro basin, an episode at the limit of what is considered extraordinary that leaves us these images of the response of the Ebro Resilience intervention typologies in this stretch
6 March, 2024

LIFE – Local forum on future land use in the meander of El Señorío, Castejón (Navarre)

  From the LIFE Ebro Resilience P1 Project we are involving the local population in the development of the interventions we carry out for flood risk reduction. Therefore, we invite all interested people to a deliberative day in which we […]
29 February, 2024

Ideas and proposals from the territory: LIFE Ebro Resilience P1 opens new avenues of participation on the use of land in El Señorío

The Project organizes an open forum on future uses in this meander that will recover its function as a natural space, a public activity that was also carried out to gather proposals in the meander of La Roza, in Alfaro.
20 February, 2024
Trabajos de instalación de la tubería de hormigón para el sistema de riegos de la Comunidad Huerta del Ebro, en Fuentes de Ebro (Zaragoza)

Installing the new pipeline that adapts the irrigation system in Fuentes de Ebro to the risk of flooding.

The laying of the new concrete pipe, with a total length of 2,300 meters in this phase, which moves this infrastructure away from the riverbed in the Huerta del Ebro Irrigation Community, is in progress.
9 February, 2024
Plantación realizada durante la restauración ambeintal

La Roza environmental restoration underway, last step to complete the LIFE intervention in this meander

- These works are being carried out by the Government of La Rioja and will involve the planting of more than 4,600 specimens of riparian species imitating the natural growth of riparian vegetation.
English