15 April, 2024

Informative sessions of the Government of Navarre on subsidies for adaptation to flood risks

On April 30 and May 2 and 3, the Directorate General for the Environment of Navarra will resolve doubts about the two calls for subsidies addressed to local entities for actions for protection and adaptation to flood risk, both with NextGeneration funds and one of them focused on the municipalities within the scope of the Ebro Resilience Strategy.
12 April, 2024

LIFE Ebro Resilience P1: hosts basin organizations from all over Spain to discuss adaptation and public participation

Up to 40 technical colleagues from state and regional river basin organizations have learned first-hand about the Project's ongoing actions and its pioneering proposal for social participation, during the conferences held on April 10 and 11.
2 April, 2024

Guided tour through the Soto de Aguilar, in Fuentes de Ebro.

On April 28th, an informative guided tour on the Ebro River and the risk of flooding will be organized. During the morning we will go through the meander of Aguilar, in the municipality of Fuentes de Ebro. There, we will see birds, learn about the works to be carried out and some concepts of fluvial dynamics. Sign up.
22 March, 2024

Ebro Resilience Strategy and LIFE Ebro Resilience Project P1

Coordination and participation as a tool to achieve a more flood-resilient middle Ebro, improving the ecological status and local biodiversity. In the framework of World Water Day, which is celebrated every March 22nd, the Strategy Ebro Strategy Resilience Strategy Strategy […]
21 March, 2024

The relief channel in the meander of La Roza: a riparian corridor with more continuity and diversity for habitats.

The restoration of vegetation that is being carried out with vegetation typical of the Ebro riverbank in this channel, created during the morphological adaptation, gives us the excuse to talk about this type of intervention.
13 March, 2024

Ebro Resilience Interventions: a review in images of the last flooding of the river

The last week of February has seen a flood of flows in the middle stretch of the Ebro due to the rains recorded in the Ebro basin, an episode at the limit of what is considered extraordinary that leaves us these images of the response of the Ebro Resilience intervention typologies in this stretch
29 February, 2024

Ideas and proposals from the territory: LIFE Ebro Resilience P1 opens new avenues of participation on the use of land in El Señorío

The Project organizes an open forum on future uses in this meander that will recover its function as a natural space, a public activity that was also carried out to gather proposals in the meander of La Roza, in Alfaro.
20 February, 2024

Installing the new pipeline that adapts the irrigation system in Fuentes de Ebro to the risk of flooding.

The laying of the new concrete pipe, with a total length of 2,300 meters in this phase, which moves this infrastructure away from the riverbed in the Huerta del Ebro Irrigation Community, is in progress.