20 May, 2024

Nature-based solutions: recovery of river branches in Soto de Alfaro begins

This intervention is part of Zone 1 of LIFE Ebro Resilience P1, in what is called the combined section of actions to mitigate the effects of floods and will allow the recovery of the functionality of the meander, helping to fulfill its role as a fluvial space.
13 May, 2024

Walking Rivers: LIFE Ebro Resilience Project participates in this worldwide experience

On May 11, we joined this initiative that led hundreds of people to walk the river paths in the five continents, and together with the riverside population we completed the route from the meander of El Señorío (Castejón, in Navarra) and the meander of La Roza (Alfaro, La Rioja).
1 May, 2024

Interpretative descents on the Ebro: more knowledge about the river and the Resilience actions

- This April, one of the most attractive lines of actions for strengthening social capacities and increasing knowledge about the river was launched. Journalism students from the faculties of Aragon, high school students from Alfaro and Castejón or technicians from other projects have already made interpretative descents with us.
30 April, 2024

Phase 1 of the adapted irrigation network in Fuentes de Ebro has been tested.

The first phase of the new pipeline for the irrigation system of the Huerta del Ebro Irrigation Community, in Fuentes de Ebro, Zaragoza, has been completed, reaching 1,350 meters of this infrastructure. During the last week of April, a test run of the installation was carried out, with satisfactory results, and it could be used by its users immediately.
16 April, 2024

Commitment to adaptation in the middle segment: subsidies through NextGeneration Funds in La Rioja,

The Autonomous Communities of the middle stretch of the Ebro, members of the Ebro Resilience Strategy and partners of the LIFE Ebro Resilience P1 Project have launched lines of aid for private individuals and local entities, aimed at protection and adaptation to flood risk included in the Recovery, Transformation and Resilience Plan, the example being the publication of aid from the Government of La Rioja on April 12.
15 April, 2024

Informative sessions of the Government of Navarre on subsidies for adaptation to flood risks

On April 30 and May 2 and 3, the Directorate General for the Environment of Navarra will resolve doubts about the two calls for subsidies addressed to local entities for actions for protection and adaptation to flood risk, both with NextGeneration funds and one of them focused on the municipalities within the scope of the Ebro Resilience Strategy.
12 April, 2024

LIFE Ebro Resilience P1: hosts basin organizations from all over Spain to discuss adaptation and public participation

Up to 40 technical colleagues from state and regional river basin organizations have learned first-hand about the Project's ongoing actions and its pioneering proposal for social participation, during the conferences held on April 10 and 11.
2 April, 2024

Guided tour through the Soto de Aguilar, in Fuentes de Ebro.

On April 28th, an informative guided tour on the Ebro River and the risk of flooding will be organized. During the morning we will go through the meander of Aguilar, in the municipality of Fuentes de Ebro. There, we will see birds, learn about the works to be carried out and some concepts of fluvial dynamics. Sign up.
Generic filters
Exact matches only